2 MW Technikumsanlage des BFI

1 MW pilot plant

Your goals:

Examination of burners, components and devices

  • under operating conditions
  • in trial operation with process and metallurgical gases from the factory network
  • with defined preheated combustion air and / or fuel gas
  • with controlled furnace room temperature by heat sink
  • with a defined atmosphere in near stoichiometry strongly over- or under-stoichiometric operation
  • with high-resolution measurement of the reaction sequence in the area of the flame

Our portfolio:

  • Flexible burner tests on own test facility
  • Connections up to 2 MW
  • Combustion gases: natural gas, blast furnace gas, coke gas
  • Technical gases: oxygen, nitrogen
  • Combustion air preheating up to 1,100 ° C
  • Fuel gas preheating up to 500 ° C
  • Burnout measurements in flame
  • Local analysis measurements via flexible probes (O2, CO, CO2, NOX, T, … ..)
  • Flexible, digital measurement acquisition
  • Photo and video documentation

Gallery

Recommendation

Thermography for energy monitoring of products and processes

With the aid of thermocameras, temperatures and energy losses of products and aggregates can be visualized Your goals: Non-contact detection […]

Process models blast furnace frame

Your goals: Determination of the gap and position of the dead man Determination of filling level in the baking rack […]

BFI HR-Server – Interactive analysis of high-resolution data

Initial situation: Due to the use of modern measuring systems, increasingly high-resolution (HR) data are collected along the entire process […]

IntModCon – Integrated process models for liquid steel production

Initial situation: The development of a melt in temperature and chemical analysis during liquid steel production can generally be observed […]