1 MW pilot plant

Your goals:

Examination of burners, components and devices

  • under operating conditions
  • in trial operation with process and metallurgical gases from the factory network
  • with defined preheated combustion air and / or fuel gas
  • with controlled furnace room temperature by heat sink
  • with a defined atmosphere in near stoichiometry strongly over- or under-stoichiometric operation
  • with high-resolution measurement of the reaction sequence in the area of the flame

Our portfolio:

  • Flexible burner tests on own test facility
  • Connections up to 1 MW
  • Electrical connection: up to 3 x 50 kW (400 V, 125 A)
  • Combustion gases: natural gas, blast furnace gas, coke gas
  • Technical gases: Oxygen, nitrogen, H2 up to 60 % by means of coke oven gas, 100 % H2 possible via cylinders
  • Combustion air preheating up to 1,100 ° C
  • Fuel gas preheating up to 500 ° C
  • Burnout measurements in flame
  • Local analysis measurements via flexible probes (O2, CO, CO2, NOX, T, … ..)
  • Flexible, digital measurement acquisition
  • Photo and video documentation (e.g. UV camera)

 

 

Recommendation

Hydrogen for a low CO2 steel production

As the steel industry is responsible for around 6 % of the global anthropogenic CO2 emissions, it has a high […]

Optimization of block casting

Your goals: Cost-effective evaluation of possible process changes Improve product quality Avoiding rejects Our portfolio: Design / optimization of pouring […]

New measuring instrument for the determination of the combustion technology properties of process, mixed and natural gases

Your goals: Efficient combustion of process, mixed and natural gases even in the case of changes in the fuel gas […]

Processing of raw materials and residues by agglomeration

Situation: Agglomeration also results in fine-grained feedstocks, e.g. Alternative carbon carriers, fine-grained or ferrous residuals, and made usable for sintering […]