Integrierte Dicken- und Planheitsregelung

S5 – Integrated thickness and flatness control

Initial situation:

  • The regulations of the strip thickness and the strip planarity influence each other.
  • The planarity controller is artificially slowed down to reduce the band thickness disturbances

Working topics:

  • Development of an integrated control concept for thickness and flatness control
  • Development of an online plant model, Planeness and band thickness model validation
  • Implementation of the scheme

Results:

  • Planarity actuators operate at maximum speed, fast adjustment of planarity errors
  • No undesirable cross-connections between flatness and thickness adjusters
  • Lower thickness deviation over belt length
  • High acceptance by the operator
  • New regulation runs stable and reliable

Recommendation

LowCarbonFuture – Exploitation of Projects for Low-Carbon Future Steel Industry

Initial situation The iron and steel industry is one of the most energy intensive sectors EU Commissions Low Carbon Roadmap […]

INSPIREWATER – Innovative Solutions in the Process Industry for next generation Resource Efficient Water management

Initial situation Process related intake of scale, formation of hardness and salting (rolling mill cooling water) or metals in pickling […]

FOMTM – Fibre optical thermal monitoring at CC billet mould

Initial situation: The initial solidification of the molten steel is important for determining the quality of the cast product Rim formation […]

OptiBlaFIns – Analysis of blast furnace hearth state

Initial situation: bad hearth condition influences energy consumption, operational stability, hot metal quality and productivity. from earlier research projects offline […]