2 MW Technikumsanlage des BFI

1 MW pilot plant

Your goals:

Examination of burners, components and devices

  • under operating conditions
  • in trial operation with process and metallurgical gases from the factory network
  • with defined preheated combustion air and / or fuel gas
  • with controlled furnace room temperature by heat sink
  • with a defined atmosphere in near stoichiometry strongly over- or under-stoichiometric operation
  • with high-resolution measurement of the reaction sequence in the area of the flame

Our portfolio:

  • Flexible burner tests on own test facility
  • Connections up to 2 MW
  • Combustion gases: natural gas, blast furnace gas, coke gas
  • Technical gases: oxygen, nitrogen
  • Combustion air preheating up to 1,100 ° C
  • Fuel gas preheating up to 500 ° C
  • Burnout measurements in flame
  • Local analysis measurements via flexible probes (O2, CO, CO2, NOX, T, … ..)
  • Flexible, digital measurement acquisition
  • Photo and video documentation

Gallery

Recommendation

DynAcid – Online concentration monitoring in pickling baths

Initial situation: The targeted adjustment of the optimum concentrations of free acid fractions and metals in industrial steel pickling baths […]

Chemical-free deposition of magnetic particles from liquid process media

Initial situation: In the iron, steel and metal processing industry, the input of metallic particles (for example, scale) into various […]

High temperature corrosion

Your goals: Under operating conditions (furnace atmosphere, temperature, times) Determination of scale constants Determination of decarburization tendency Selection of suitable […]

Knowledge management through semantic modeling

Communication between autonomous systems requires a common language and uniform semantics. Furthermore, due to the increasing complexity of the entire […]