2 MW Technikumsanlage des BFI

2 MW pilot plant

Your goals:

Examination of burners, components and devices

  • under operating conditions
  • in trial operation with process and metallurgical gases from the factory network
  • with defined preheated combustion air and / or fuel gas
  • with controlled furnace room temperature by heat sink
  • with a defined atmosphere in near stoichiometry strongly over- or under-stoichiometric operation
  • with high-resolution measurement of the reaction sequence in the area of the flame

Our portfolio:

  • Flexible burner tests on own test facility
  • Connections up to 2 MW
  • Combustion gases: natural gas, blast furnace gas, coke gas
  • Technical gases: oxygen, nitrogen
  • Combustion air preheating up to 1,100 ° C
  • Fuel gas preheating up to 500 ° C
  • Burnout measurements in flame
  • Local analysis measurements via flexible probes (O2, CO, CO2, NOX, T, … ..)
  • Flexible, digital measurement acquisition
  • Photo and video documentation

Gallery

Recommendation

On-line measurement of acid and metal salt concentration in pickling baths

Initial situation: The targeted adjustment of the optimum concentrations of free acid fractions and metals in industrial steel pickling baths […]

Knowledge management through semantic modeling

Communication between autonomous systems requires a common language and uniform semantics. Furthermore, due to the increasing complexity of the entire […]

Optimization of dedusting

Goals: Cost-effective inventory and assessment of existing plants with regard to dust emissions and the efficiency of dedusting Proposal and […]

BFI HR-Server – Interactive analysis of high-resolution data

Initial situation: Due to the use of modern measuring systems, increasingly high-resolution (HR) data are collected along the entire process […]