2 MW Technikumsanlage des BFI

1 MW pilot plant

Your goals:

Examination of burners, components and devices

  • under operating conditions
  • in trial operation with process and metallurgical gases from the factory network
  • with defined preheated combustion air and / or fuel gas
  • with controlled furnace room temperature by heat sink
  • with a defined atmosphere in near stoichiometry strongly over- or under-stoichiometric operation
  • with high-resolution measurement of the reaction sequence in the area of the flame

Our portfolio:

  • Flexible burner tests on own test facility
  • Connections up to 2 MW
  • Combustion gases: natural gas, blast furnace gas, coke gas
  • Technical gases: oxygen, nitrogen
  • Combustion air preheating up to 1,100 ° C
  • Fuel gas preheating up to 500 ° C
  • Burnout measurements in flame
  • Local analysis measurements via flexible probes (O2, CO, CO2, NOX, T, … ..)
  • Flexible, digital measurement acquisition
  • Photo and video documentation

Gallery

Recommendation

DynAcid – Online concentration monitoring in pickling baths

Initial situation: The targeted adjustment of the optimum concentrations of free acid fractions and metals in industrial steel pickling baths […]

Optimization of block casting

Your goals: Cost-effective evaluation of possible process changes Improve product quality Avoiding rejects Our portfolio: Design / optimization of pouring […]

Adjustment of the fuel gas air ratio in the near stoichiometric range

Your goals: Efficient heat treatment of steel, non-ferrous metals, porcelain / ceramics Gas generation from natural gas Complete thermal post-combustion […]

Process models blast furnace frame

Your goals: Determination of the gap and position of the dead man Determination of filling level in the baking rack […]